3 results
Search Results
Now showing 1 - 3 of 3
Article Citation - WoS: 30Citation - Scopus: 39A Transformative Solution for Construction Safety: Blockchain-Based System for Accident Information Management(Elsevier, 2023) Ahmadisheykhsarmast, Salar; Aminbakhsh, Saman; Sonmez, Rifat; Uysal, FurkanEffective management of accident information is a crucial component of safety management within the construction industry, as it reflects the safety performance of the company and allows them to identify the root causes of accidents and prevent similar accidents in the future. However, existing safety information systems provide self-owned, isolated, and centralized environments and fail to present a secure, transparent, and trustworthy platform for monitoring and management of accident information. To address these issues, this paper presents a novel decentralized blockchain-based system for accident/incident information management of construction projects. The proposed system leverages the benefits and advantages of blockchain, smart contracts, and decentralized IPFS storage to address the security transparency, tampering, and trustworthiness issues of the conventional approaches. The proposed system is simulated by using real-world construction accident data to demonstrate how blockchain technology can provide a novel solution to assure security, transparency, authenticity, availability, and immutability of the accident/incident data for improving safety management.Article Semiautomated Delay Analysis Method Selection for Construction Projects: A Rule-Based Approach(ASCE-Amer Soc Civil Engineers, 2026) Agar, Mehmet; Sonmez, Rifat; Aminbakhsh, SamanGiven the availability of various delay analysis methods, each yielding different results, the proper selection of an appropriate methodology is of paramount importance. Despite the necessity for automation to resolve delay conflicts, the current literature lacks an automated approach to assist contractors and project owners in reaching a consensus on selecting the most suitable delay analysis method without requiring a third party. Hence, to bridge the gap between theoretical research and practical application in achieving an automated delay analysis method, a novel rule-based expert system has been proposed. A structured, multiphase methodology that includes a review of existing methods, identification of key facts, determination of facts and expert rules, development of a forward chaining inference engine, and validation stages is used. Five real-world case examples and the decisions of experts for 15 hypothetical case examples are used for validation. The case examples demonstrate that the system can successfully automate the selection of the most appropriate delay analysis method and support a transparent, systematic approach to managing delays in construction projects. Furthermore, the system can foster consensus among project stakeholders during the selection of a delay analysis method and has the potential to contribute to the resolution of delay disputes.Article Citation - WoS: 3Citation - Scopus: 3Ε-Constraint Procedures for Pareto Front Optimization of Large Size Discrete Time/Cost Trade-Off Problem(Elsevier, 2025) Aminbakhsh, Saman; Sonmez, Rifat; Atan, TankutThe discrete time/cost trade-off problem (DTCTP) optimizes the project duration and/or cost while considering the trade-off between activity durations and their direct costs. The complete and non-dominated time-cost profile over the set of feasible project durations is achieved within the framework of Pareto front problem. Despite the importance of Pareto front optimization in project and portfolio management, exact procedures have achieved very limited success in solving the problem for large size instances. This study develops exact procedures based on combinations of mixed-integer linear programming (MILP), epsilon-constraint method, network and problem reduction techniques, and present new bounding strategies to solve the Pareto problem for large size instances. This study also provides new large size benchmark problem instances aiming to represent the size of real-life projects for the DTCTP. The new instances, therefore, are generated to include up to 990 activities and nine execution modes. Computational experiments reveal that the procedures presented herein can remarkably outperform the state-of-the-art exact methods. The new exact procedures enabled obtaining the optimal Pareto front for instances with serial networks that include more than 200 activities for the first time.
