Search Results

Now showing 1 - 2 of 2
  • Article
    Citation - WoS: 5
    Citation - Scopus: 5
    Managing Requirements in Market-Driven Software Project: Agile Methods View
    (Univ Osijek, Tech Fac, 2010) Mishra, Deepti; Mishra, Alok; Computer Engineering; Software Engineering
    Time-to-market and insufficient initial requirements are two significant challenges that make managing requirements for market-driven software projects different from custom-made software projects. These challenges can be resolved by using agile software development methodologies for market-driven software development as agile methods put emphasis on a dynamic approach for requirement engineering which works closely with an iterative release cycle. In this study, dynamic requirement engineering approach of Agile methods was used for the successful implementation of market-driven complex software project.
  • Article
    Citation - WoS: 5
    Citation - Scopus: 6
    Enhancing Misuse Cases With Risk Assessment for Safety Requirements
    (Ieee-inst Electrical Electronics Engineers inc, 2020) Arogundade, Oluwasefunmi T.; Misra, Sanjay; Abayomi-Alli, Olusola O.; Fernandez-Sanz, Luis
    Risk-driven requirements elicitation represents an approach that allows assignment of appropriate countermeasure for the protection of the Information System (IS) depending on the risk level. Elicitation of safety requirements based on risk analysis is essential for those IS which will run on the open and dynamic Internet platform. Traditionally, misuse cases are used to find the weak points of an IS but cannot differentiate between the weak point that can lead to lenient hazard and/or serious hazard. In this paper, we present an enhanced misuse case approach to support IS safety risk assessment at the early stages of software process. We extensively examined and identified concepts which constitute a modelling technique for IS safety risk assessment and build a conceptual model for achieving IS safety risk assessment during the requirement analysis phase of software process. The risk assessment process follows an approach of consequential analysis based on misuse cases for safety hazard identification and qualitative risk measurement. The safety requirements are elicited according to the results of the risk assessment. A medical IS is used as a case study to validate the proposed model.