Long term behavior of staged construction of a dam on soft clay

dc.authorscopusid56544139400
dc.authorscopusid55339792700
dc.contributor.authorGürbüz, Ayhan
dc.contributor.authorDincergok,T.
dc.contributor.otherDepartment of Civil Engineering
dc.date.accessioned2024-07-05T15:43:15Z
dc.date.available2024-07-05T15:43:15Z
dc.date.issued2009
dc.departmentAtılım Universityen_US
dc.department-tempGurbuz A., Atilim University, Ankara, Turkey; Dincergok T., General State of Hydraulic Works, Ankara, Turkeyen_US
dc.description.abstractThe staged-construction of Alibey Dam on the Alibey Creek near Istanbul in Turkey started in 1968 and ended in 1983 to generate a reservoir to meet up the water requirement of Istanbul. Alibey Dam had a geotechnical challenge of a 29.5 m high zoned earth-fill dam on 33-m-thick soft alluvial foundation and occasional sand bands. Alibey Dam consists of upstream cofferdam, downstream cofferdam, main body and test embankment. Before the construction of Alibey Dam, both extensive field and laboratory tests were performed to determine the engineering parameters of foundation soils. During the construction and approximately 30 years after the construction of the dam, the behavior of the foundation soils and the embankments were monitored using extensive instrumentation placed into the foundation soils and the dam body. All available performed and measured data before the construction, during the construction and approximately 30 years after the construction are collected and presented here to shed light on the staged construction of the dam on soft clay. © 2009 IOS Press.en_US
dc.identifier.citation0
dc.identifier.doi10.3233/978-1-60750-031-5-1915
dc.identifier.endpage1918en_US
dc.identifier.isbn978-160750031-5
dc.identifier.scopus2-s2.0-84865194591
dc.identifier.startpage1915en_US
dc.identifier.urihttps://doi.org/10.3233/978-1-60750-031-5-1915
dc.identifier.urihttps://hdl.handle.net/20.500.14411/3597
dc.identifier.volume3en_US
dc.language.isoenen_US
dc.relation.ispartofProceedings of the 17th International Conference on Soil Mechanics and Geotechnical Engineering: The Academia and Practice of Geotechnical Engineering -- 17th International Conference on Soil Mechanics and Geotechnical Engineering, ICSMGE 2009 -- 5 October 2009 through 9 October 2009 -- Alexandria -- 92003en_US
dc.relation.publicationcategoryKonferans Öğesi - Uluslararası - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectDamen_US
dc.subjectEarth fillen_US
dc.subjectSoft soilen_US
dc.subjectStaged constructionen_US
dc.subjectTurkeyen_US
dc.titleLong term behavior of staged construction of a dam on soft clayen_US
dc.typeConference Objecten_US
dspace.entity.typePublication
relation.isAuthorOfPublicationbb801720-15b4-4250-b99e-d13358014420
relation.isAuthorOfPublication.latestForDiscoverybb801720-15b4-4250-b99e-d13358014420
relation.isOrgUnitOfPublication238c4130-e9ea-4b1c-9dea-772c4a0dad39
relation.isOrgUnitOfPublication.latestForDiscovery238c4130-e9ea-4b1c-9dea-772c4a0dad39

Files

Collections