A simulation model for mine production sequences

dc.authorscopusid 15071481800
dc.authorscopusid 35607841600
dc.authorscopusid 57215492362
dc.contributor.author Aydiner,K.
dc.contributor.author Çelebi,N.
dc.contributor.author Paşamehmetoǧlu,A.G.
dc.contributor.other Industrial Engineering
dc.date.accessioned 2024-10-06T11:13:30Z
dc.date.available 2024-10-06T11:13:30Z
dc.date.issued 2006
dc.department Atılım University en_US
dc.department-temp Aydiner K., Black Sea Technical University, Mining Engineering Department, 61080-Trabzon, Turkey; Çelebi N., Atilim University, Industrial Engineering Department, 06386-Ankara, Turkey; Paşamehmetoǧlu A.G., Atilim University, Civil Engineering Department, 06386-Ankara, Turkey en_US
dc.description IASTED, Technical Committee on Energy and Power Systems; World Modelling and Simulation Forum, WMSF en_US
dc.description.abstract Mine design process strictly dependent on the economical variables of the orebody and the rock mass properties having effect on the physical parameters of the intended mining system. In addition, the dynamic aspects of the possible system must be taken into account. Difficulty in design arises mainly from the difficulty in obtaining enough and reliable data. Collecting enough and quality data requires to costly and timely procedures. Therefore, the mine design engineers have to consider alternative cases in their designs or they have to design with limited data. This study presents a simulation model that can be used to develop the production subsystem model of an underground mining system. A mechanized production system model and a decision analysis tool using a discrete event simulation process were developed. The tool allows an engineer with experimenting his/her design to generate a model that can meet the targeted production rate. en_US
dc.identifier.citationcount 2
dc.identifier.endpage 295 en_US
dc.identifier.isbn 0889865612
dc.identifier.isbn 978-088986561-7
dc.identifier.scopus 2-s2.0-33751278438
dc.identifier.startpage 290 en_US
dc.identifier.uri https://hdl.handle.net/20.500.14411/9200
dc.identifier.volume 2006 en_US
dc.institutionauthor Çelebi, Neşe
dc.language.iso en en_US
dc.relation.ispartof Proceedings of the 15th IASTED International Conference on Applied Simulation and Modelling -- 15th IASTED International Conference on Applied Simulation and Modelling -- 26 June 2006 through 28 June 2006 -- Rhodes -- 68598 en_US
dc.relation.publicationcategory Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.scopus.citedbyCount 3
dc.subject Cut-and-fill mining en_US
dc.subject Discrete event simulation en_US
dc.subject Systems modeling en_US
dc.subject Underground mining en_US
dc.title A simulation model for mine production sequences en_US
dc.type Conference Object en_US
dspace.entity.type Publication
relation.isAuthorOfPublication 19f05c8c-7b2f-4d2f-b69d-ee9dad17fee4
relation.isAuthorOfPublication.latestForDiscovery 19f05c8c-7b2f-4d2f-b69d-ee9dad17fee4
relation.isOrgUnitOfPublication 12c9377e-b7fe-4600-8326-f3613a05653d
relation.isOrgUnitOfPublication.latestForDiscovery 12c9377e-b7fe-4600-8326-f3613a05653d

Files

Collections