Aminbakhsh, Saman

Loading...
Profile Picture
Name Variants
Saman, Aminbakhsh
S., Aminbakhsh
A., Saman
Saman Aminbakhsh
S.,Aminbakhsh
Aminbakhsh,Saman
A.,Saman
Aminbakhsh, Saman
Aminbakhsh,S.
Job Title
Doktor Öğretim Üyesi
Email Address
saman.aminbakhsh@atilim.edu.tr
Main Affiliation
Civil Engineering
Status
Website
Scopus Author ID
Turkish CoHE Profile ID
Google Scholar ID
WoS Researcher ID

Sustainable Development Goals

5

GENDER EQUALITY
GENDER EQUALITY Logo

0

Research Products

14

LIFE BELOW WATER
LIFE BELOW WATER Logo

1

Research Products

10

REDUCED INEQUALITIES
REDUCED INEQUALITIES Logo

0

Research Products

3

GOOD HEALTH AND WELL-BEING
GOOD HEALTH AND WELL-BEING Logo

0

Research Products

2

ZERO HUNGER
ZERO HUNGER Logo

0

Research Products

9

INDUSTRY, INNOVATION AND INFRASTRUCTURE
INDUSTRY, INNOVATION AND INFRASTRUCTURE Logo

1

Research Products

16

PEACE, JUSTICE AND STRONG INSTITUTIONS
PEACE, JUSTICE AND STRONG INSTITUTIONS Logo

0

Research Products

11

SUSTAINABLE CITIES AND COMMUNITIES
SUSTAINABLE CITIES AND COMMUNITIES Logo

0

Research Products

8

DECENT WORK AND ECONOMIC GROWTH
DECENT WORK AND ECONOMIC GROWTH Logo

0

Research Products

13

CLIMATE ACTION
CLIMATE ACTION Logo

0

Research Products

4

QUALITY EDUCATION
QUALITY EDUCATION Logo

0

Research Products

6

CLEAN WATER AND SANITATION
CLEAN WATER AND SANITATION Logo

0

Research Products

1

NO POVERTY
NO POVERTY Logo

0

Research Products

15

LIFE ON LAND
LIFE ON LAND Logo

0

Research Products

17

PARTNERSHIPS FOR THE GOALS
PARTNERSHIPS FOR THE GOALS Logo

0

Research Products

7

AFFORDABLE AND CLEAN ENERGY
AFFORDABLE AND CLEAN ENERGY Logo

1

Research Products

12

RESPONSIBLE CONSUMPTION AND PRODUCTION
RESPONSIBLE CONSUMPTION AND PRODUCTION Logo

0

Research Products
Documents

15

Citations

632

h-index

8

Documents

16

Citations

532

Scholarly Output

15

Articles

11

Views / Downloads

43/0

Supervised MSc Theses

2

Supervised PhD Theses

0

WoS Citation Count

115

Scopus Citation Count

102

WoS h-index

5

Scopus h-index

4

Patents

0

Projects

0

WoS Citations per Publication

7.67

Scopus Citations per Publication

6.80

Open Access Source

4

Supervised Theses

2

Google Analytics Visitor Traffic

JournalCount
Structures2
Journal of Construction Engineering, Management & Innovation2
European Journal of Operational Research1
Journal of Building Engineering1
Journal of Construction Engineering and Management1
Current Page: 1 / 3

Scopus Quartile Distribution

Competency Cloud

GCRIS Competency Cloud

Scholarly Output Search Results

Now showing 1 - 2 of 2
  • Article
    Citation - WoS: 4
    Citation - Scopus: 4
    Ε-Constraint Procedures for Pareto Front Optimization of Large Size Discrete Time/Cost Trade-Off Problem
    (Elsevier, 2025) Aminbakhsh, Saman; Sonmez, Rifat; Atan, Tankut
    The discrete time/cost trade-off problem (DTCTP) optimizes the project duration and/or cost while considering the trade-off between activity durations and their direct costs. The complete and non-dominated time-cost profile over the set of feasible project durations is achieved within the framework of Pareto front problem. Despite the importance of Pareto front optimization in project and portfolio management, exact procedures have achieved very limited success in solving the problem for large size instances. This study develops exact procedures based on combinations of mixed-integer linear programming (MILP), epsilon-constraint method, network and problem reduction techniques, and present new bounding strategies to solve the Pareto problem for large size instances. This study also provides new large size benchmark problem instances aiming to represent the size of real-life projects for the DTCTP. The new instances, therefore, are generated to include up to 990 activities and nine execution modes. Computational experiments reveal that the procedures presented herein can remarkably outperform the state-of-the-art exact methods. The new exact procedures enabled obtaining the optimal Pareto front for instances with serial networks that include more than 200 activities for the first time.
  • Article
    Citation - WoS: 24
    Activity Uncrashing Heuristic With Noncritical Activity Rescheduling Method for the Discrete Time-Cost Trade-Off Problem
    (Asce-amer Soc Civil Engineers, 2020) Sonmez, Rifat; Aminbakhsh, Saman; Atan, Tankut
    Despite intensive research efforts that have been devoted to discrete time-cost optimization of construction projects, the current methods have very limited capabilities for solving the problem for real-life-sized projects. This study presents a new activity uncrashing heuristic with noncritical activity rescheduling method to narrow the gap between the research and practice for time-cost optimization. The uncrashing heuristic searches for new solutions by uncrashing the critical activities with the highest cost-slope. This novel feature of the proposed heuristic enables identification and elimination of the dominated solutions during the search procedure. Hence, the heuristic can determine new high-quality solutions based on the nondominated solutions. Furthermore, the proposed noncritical activity rescheduling method of the heuristic decreases the amount of scheduling calculations, and high-quality solutions are achieved within a short CPU time. Results of the computational experiments reveal that the new heuristic outperforms state-of-the-art methods significantly for large-scale single-objective cost minimization and Pareto front optimization problems. Hence, the primary contribution of the paper is a new heuristic method that can successfully achieve high-quality solutions for large-scale discrete time-cost optimization problems.