Melek, Abiddin Berhan

Loading...
Profile Picture
Name Variants
Melek, A. Berhan
M.,Abiddin Berhan
M., Abiddin Berhan
A., Melek
A.,Melek
Melek, Abiddin Berhan
Abiddin Berhan, Melek
A.B.Melek
Melek,A.B.
Job Title
Araştırma Görevlisi
Email Address
berhan.melek@atilim.edu.tr
Main Affiliation
Department of Civil Engineering
Status
Former Staff
Website
ORCID ID
Scopus Author ID
Turkish CoHE Profile ID
Google Scholar ID
WoS Researcher ID

Sustainable Development Goals

NO POVERTY1
NO POVERTY
0
Research Products
ZERO HUNGER2
ZERO HUNGER
0
Research Products
GOOD HEALTH AND WELL-BEING3
GOOD HEALTH AND WELL-BEING
0
Research Products
QUALITY EDUCATION4
QUALITY EDUCATION
0
Research Products
GENDER EQUALITY5
GENDER EQUALITY
0
Research Products
CLEAN WATER AND SANITATION6
CLEAN WATER AND SANITATION
1
Research Products
AFFORDABLE AND CLEAN ENERGY7
AFFORDABLE AND CLEAN ENERGY
0
Research Products
DECENT WORK AND ECONOMIC GROWTH8
DECENT WORK AND ECONOMIC GROWTH
0
Research Products
INDUSTRY, INNOVATION AND INFRASTRUCTURE9
INDUSTRY, INNOVATION AND INFRASTRUCTURE
0
Research Products
REDUCED INEQUALITIES10
REDUCED INEQUALITIES
0
Research Products
SUSTAINABLE CITIES AND COMMUNITIES11
SUSTAINABLE CITIES AND COMMUNITIES
1
Research Products
RESPONSIBLE CONSUMPTION AND PRODUCTION12
RESPONSIBLE CONSUMPTION AND PRODUCTION
0
Research Products
CLIMATE ACTION13
CLIMATE ACTION
0
Research Products
LIFE BELOW WATER14
LIFE BELOW WATER
0
Research Products
LIFE ON LAND15
LIFE ON LAND
0
Research Products
PEACE, JUSTICE AND STRONG INSTITUTIONS16
PEACE, JUSTICE AND STRONG INSTITUTIONS
0
Research Products
PARTNERSHIPS FOR THE GOALS17
PARTNERSHIPS FOR THE GOALS
0
Research Products
This researcher does not have a Scopus ID.
This researcher does not have a WoS ID.
Scholarly Output

2

Articles

2

Views / Downloads

17/97

Supervised MSc Theses

0

Supervised PhD Theses

0

WoS Citation Count

21

Scopus Citation Count

22

Patents

0

Projects

0

WoS Citations per Publication

10.50

Scopus Citations per Publication

11.00

Open Access Source

0

Supervised Theses

0

JournalCount
Environmental Earth Sciences1
Natural Hazards1
Current Page: 1 / 1

Scopus Quartile Distribution

Competency Cloud

GCRIS Competency Cloud

Scholarly Output Search Results

Now showing 1 - 1 of 1
  • Article
    Citation - WoS: 12
    Citation - Scopus: 12
    Assessment of Flood Hazards Due To Overtopping and Piping in Dalaman Akkopru Dam, Employing Both Shallow Water Flow and Diffusive Wave Equations
    (Springer, 2023) Yilmaz, Kutay; Darama, Yakup; Oruc, Yunus; Melek, A. Berhan
    This study was carried out to determine flood propagation using shallow water equations (SWEs) and diffusive wave equations (DWEs) to reveal how the flood modeling results differ in terms of flow depth, flow velocity, and hazard level. The solution methods were tested based on the hypothetical failure of the Dalaman Akkopru Dam resulting from two failure mechanisms: overtopping (OT) and piping (PP). A 2D hydraulic model was constructed using HEC-RAS to determine the propagation of flood waves due to the failure of the dam by the mechanisms selected. Froehlich equations were applied to predict the breaching parameters of the dam. After calibration, the hydraulic model was run to determine the possible flooding magnitude in the towns of Ortaca, Dalaman, and Dalyan. The flood arrival times, maximum flow depths, flow velocities, and hazard classes were obtained for the Dalaman, Ortaca, and Dalyan city centers, and the Dalaman International Airport from the hydraulic model results. The modeling results showed that the inundated area is similar for both the SWEs and DWEs solutions, while the flow depth and velocity results are significantly different due to the neglected convective acceleration terms of the SWEs when deriving the DWEs. Considering the modeling results, even though the DWEs provide a computational cost advantage, the reliability of the solutions should be examined against the SWEs. Hazard maps were generated for both solution methods and failure mechanisms. The results revealed that most of the settlements in the basin have H5 and H6 hazard classes with a high risk of structural damage. Therefore, the installation of early warning systems and evacuation of district centers were suggested as mitigation measures. A feasible evacuation plan for the neighborhoods, taking into account the flood arrival time of the failure scenarios, is needed.