Start-Up Demonstration Test Based on Total Successes and Total Failures With Dependent Start-Ups
dc.authorid | Yalcin, Femin/0000-0003-0602-9392 | |
dc.authorid | Eryilmaz, Serkan/0000-0002-2108-1781 | |
dc.authorscopusid | 37050274700 | |
dc.authorscopusid | 8203625300 | |
dc.authorwosid | Yalcin, Femin/N-9138-2015 | |
dc.authorwosid | Eryilmaz, Serkan/AAF-9349-2019 | |
dc.contributor.author | Yalcin, Femin | |
dc.contributor.author | Eryilmaz, Serkan | |
dc.contributor.other | Industrial Engineering | |
dc.date.accessioned | 2024-07-05T15:10:55Z | |
dc.date.available | 2024-07-05T15:10:55Z | |
dc.date.issued | 2012 | |
dc.department | Atılım University | en_US |
dc.department-temp | [Yalcin, Femin] Izmir Univ Econ, Dept Math, TR-35330 Izmir, Turkey; [Eryilmaz, Serkan] Atilim Univ, Dept Ind Engn, TR-06836 Ankara, Turkey | en_US |
dc.description | Yalcin, Femin/0000-0003-0602-9392; Eryilmaz, Serkan/0000-0002-2108-1781 | en_US |
dc.description.abstract | Start-up demonstration testing is an effective method for illustrating the reliability of a unit before purchasing it. The test consists of starting-up the unit, and observing the outcomes, either success or failure. According to the total successes total failures (TSTF) test procedure, a unit under test is accepted when a specified number of successes is observed before a specified number of failures; otherwise, the unit is rejected. We study the TSTF procedure for dependent start-ups where the outcome of the present start-up depends on the total number of successful start-ups so far. The main characteristics of the TSTF test are obtained under this previous-sum dependent model, and numerical illustrations are presented. | en_US |
dc.identifier.citationcount | 14 | |
dc.identifier.doi | 10.1109/TR.2011.2182219 | |
dc.identifier.endpage | 230 | en_US |
dc.identifier.issn | 0018-9529 | |
dc.identifier.issue | 1 | en_US |
dc.identifier.scopus | 2-s2.0-84858157959 | |
dc.identifier.startpage | 227 | en_US |
dc.identifier.uri | https://doi.org/10.1109/TR.2011.2182219 | |
dc.identifier.uri | https://hdl.handle.net/20.500.14411/1362 | |
dc.identifier.volume | 61 | en_US |
dc.identifier.wos | WOS:000301198500025 | |
dc.identifier.wosquality | Q1 | |
dc.institutionauthor | Eryılmaz, Serkan | |
dc.language.iso | en | en_US |
dc.publisher | Ieee-inst Electrical Electronics Engineers inc | en_US |
dc.relation.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.scopus.citedbyCount | 16 | |
dc.subject | Positive dependence | en_US |
dc.subject | previous-sum dependent model | en_US |
dc.subject | start-up reliability | en_US |
dc.title | Start-Up Demonstration Test Based on Total Successes and Total Failures With Dependent Start-Ups | en_US |
dc.type | Article | en_US |
dc.wos.citedbyCount | 14 | |
dspace.entity.type | Publication | |
relation.isAuthorOfPublication | 37862217-5541-47e3-9406-e21aa38e7fdf | |
relation.isAuthorOfPublication.latestForDiscovery | 37862217-5541-47e3-9406-e21aa38e7fdf | |
relation.isOrgUnitOfPublication | 12c9377e-b7fe-4600-8326-f3613a05653d | |
relation.isOrgUnitOfPublication.latestForDiscovery | 12c9377e-b7fe-4600-8326-f3613a05653d |