Optimization-Based Scheduling of Construction Projects With Generalized Precedence Relationships: a Real-Life Case Study

dc.authoridAminbakhsh, Saman/0000-0002-4389-1910
dc.authorwosidAminbakhsh, Saman/LIF-9792-2024
dc.contributor.authorAminbakhsh, Saman
dc.contributor.authorAhmed, Ary
dc.date.accessioned2025-02-05T18:36:54Z
dc.date.available2025-02-05T18:36:54Z
dc.date.issued2025
dc.departmentAtılım Universityen_US
dc.department-temp[Aminbakhsh, Saman] Atilim Univ, Dept Civil Engn, TR-06830 Ankara, Turkiye; [Ahmed, Ary] Atilim Univ, Grad Sch Nat & Appl Sci, TR-06830 Ankara, Turkiyeen_US
dc.descriptionAminbakhsh, Saman/0000-0002-4389-1910en_US
dc.description.abstractConcomitant reduction of cost and duration is recognized as one of the main aspects of construction planning. Expedition of project schedule naturally incurs extra costs due to implementation of more productive and/or high-price construction techniques. Meanwhile, a reduction in time is usually plausible only down to a certain limit, below which renders expeditions either technically or financially unviable. Thus, striking a reasonable balance between project cost and duration remains a desirable yet challenging task for which there has been a myriad of advancements and literature. Despite the many studies associated with this problem-referred to as Time-Cost Trade-off Problem (TCTP) it is observed that only a few exercise TCTPs with the generalized logical relationships. This observation holds despite the fact that generalized precedence relationships are imperative to introduce parallelism and to secure a realistic overlap among the activities. Tn this regard, a Simulated Annealing-based (SA-based) Genetic Algorithm (GA) as proposed herein, is specifically designed to provide the capability of exerting TCTPs with properly overlapped activities. Efficiency of this algorithm is tested over a range of problems and its performance is validated over a large-scale real-case construction project. Results of the hybridized GA indicate fast and robust convergence to high-quality solutions.en_US
dc.description.woscitationindexScience Citation Index Expanded
dc.identifier.citationcount1
dc.identifier.doi10.24200/sci.2023.59493.6275
dc.identifier.endpage1824en_US
dc.identifier.issn1026-3098
dc.identifier.issue19en_US
dc.identifier.scopusqualityQ3
dc.identifier.startpage1809en_US
dc.identifier.urihttps://doi.org/10.24200/sci.2023.59493.6275
dc.identifier.urihttps://hdl.handle.net/20.500.14411/10431
dc.identifier.volume31en_US
dc.identifier.wosWOS:001389343600007
dc.identifier.wosqualityQ3
dc.language.isoenen_US
dc.publisherSharif Univ Technologyen_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectOptimizationen_US
dc.subjectTime-cost trade-off problemen_US
dc.subjectGeneralized precedence relationshipsen_US
dc.subjectGenetic algorithmen_US
dc.subjectMeta-heuristicsen_US
dc.titleOptimization-Based Scheduling of Construction Projects With Generalized Precedence Relationships: a Real-Life Case Studyen_US
dc.typeArticleen_US
dspace.entity.typePublication

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Optimization-based Scheduling of Construction Projects with Tam Metin.pdf
Size:
938.25 KB
Format:
Adobe Portable Document Format

Collections