Layout Improvement Method Selection for a Mass Production Facility

dc.authorscopusid 56521521100
dc.authorscopusid 23974132900
dc.contributor.author Baç,U.
dc.contributor.author Erkan,T.E.
dc.contributor.other Industrial Engineering
dc.date.accessioned 2024-10-06T11:16:11Z
dc.date.available 2024-10-06T11:16:11Z
dc.date.issued 2018
dc.department Atılım University en_US
dc.department-temp Baç U., Department of Industrial Engineering, Atilim University, Incek, Ankara, 06836, Turkey; Erkan T.E., Department of Industrial Engineering, Atilim University, Incek, Ankara, 06836, Turkey en_US
dc.description ARTS ET METIERS ParisTech; Fraunhofer AUSTRIA; IESEG SCHOOL OF MANAGEMENT; Igipm Laboratoire de genie Industriel et de production de Metz; TECHNISCHE UNIVERSITAT WIEN en_US
dc.description.abstract Purpose of this study is to identify, analyze, and propose a solution to an industrial problem that would satisfy the needs of a manufacturing company by using tools and techniques of Industrial Engineering. For this purpose, production system of a metal cap manufacturer company, which is a well-known mass production company in packaging industry since 1963 in Turkey, has been inspected. In the first part of the study, overall system has been analyzed, problem symptoms have been identified, and then the problem definition has been made. Two problems have been defined as: (i) insufficient production capacity, and (ii) inefficient production system. According to these findings, objectives of this study has been determined as: (i) the improvement of the efficiency of current system by making some layout changes and making small-scale investments, (ii) analyze large-scale investment alternatives in the long run and conduct engineering economic analysis of these investment alternatives. Within this scope, alternative solution approaches, analysis of these alternatives, and selection of best alternative have been accomplished. As a result of this study capacity of the facility can be increased by 16% and investment required for this increase has a payback period of 71 days. © IEOM Society International. en_US
dc.identifier.citationcount 0
dc.identifier.endpage 455 en_US
dc.identifier.issn 2169-8767
dc.identifier.issue JUL en_US
dc.identifier.scopus 2-s2.0-85066946379
dc.identifier.startpage 455 en_US
dc.identifier.uri https://hdl.handle.net/20.500.14411/9499
dc.identifier.volume 2018 en_US
dc.institutionauthor Baç, Uğur
dc.institutionauthor Erkan, Turan Erman
dc.language.iso en en_US
dc.publisher IEOM Society en_US
dc.relation.ispartof Proceedings of the International Conference on Industrial Engineering and Operations Management -- 2nd European International Conference on Industrial Engineering and Operations Management.IEOM 2018 -- 26 July 2018 through 27 July 2018 -- 140538 en_US
dc.relation.publicationcategory Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı en_US
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.scopus.citedbyCount 0
dc.subject Engineering economy en_US
dc.subject Facilities planning en_US
dc.subject Investment planning en_US
dc.subject Layout arrangement en_US
dc.title Layout Improvement Method Selection for a Mass Production Facility en_US
dc.type Conference Object en_US
dspace.entity.type Publication
relation.isAuthorOfPublication 63c3f1d9-b1d7-4ac2-b7e5-e544f2a3a0a9
relation.isAuthorOfPublication 232686ec-1b23-4304-a125-d9a30dfc2e74
relation.isAuthorOfPublication.latestForDiscovery 63c3f1d9-b1d7-4ac2-b7e5-e544f2a3a0a9
relation.isOrgUnitOfPublication 12c9377e-b7fe-4600-8326-f3613a05653d
relation.isOrgUnitOfPublication.latestForDiscovery 12c9377e-b7fe-4600-8326-f3613a05653d

Files

Collections