Prioritization of risk events in PPP wind power projects using integrated FMEA and Monte Carlo simulation

dc.contributor.authorAkçay, Emre Caner
dc.contributor.otherCivil Engineering
dc.date.accessioned2024-09-10T21:39:09Z
dc.date.available2024-09-10T21:39:09Z
dc.date.issued2021
dc.departmentAtılım Universityen_US
dc.department-tempATILIM ÜNİVERSİTESİen_US
dc.description.abstractThe popularity of public private partnership (PPP) projects has grown all over the world, especially indeveloping countries. The success of PPP projects heavily depends on how effectively risk assessments areperformed. Failure Mode and Effects Analysis (FMEA) enables risk assessment by considering the impact,the probability, and the detection rate of risk events. However, it is very difficult to predict a single value forthese variables. The objective of this research is to integrate FMEA and Monte Carlo simulation, and to usethis model to perform risk assessment and prioritization of risks in PPP projects. The proposed model wasapplied to a real wind power generation investment located in the Aegean region of Turkey. The top threeimportant risk events are “unfavorable wind speed”, “fluctuation in exchange rates”, and “interest ratevolatility”. The model perfumed to the satisfaction of experts. The primary contributions of this researchinclude (1) a method that allows the identification of the risk events in PPP projects; (2) a model that performsrisk assessment and prioritization of risk events in PPP projects; (3) an integrated FMEA and Monte Carlosimulation model that performs stochastic risk assessment in PPP projects. Both public agencies and privateconsortia should benefit from the proposed model.en_US
dc.identifier.citation0
dc.identifier.doi10.31462/jcemi.2021.02080091
dc.identifier.endpage91en_US
dc.identifier.issn2630-5771
dc.identifier.issue2en_US
dc.identifier.scopusqualityN/A
dc.identifier.startpage80en_US
dc.identifier.trdizinid461612
dc.identifier.urihttps://doi.org/10.31462/jcemi.2021.02080091
dc.identifier.urihttps://search.trdizin.gov.tr/tr/yayin/detay/461612/prioritization-of-risk-events-in-ppp-wind-power-projects-using-integrated-fmea-and-monte-carlo-simulation
dc.identifier.urihttps://hdl.handle.net/20.500.14411/7544
dc.identifier.volume4en_US
dc.identifier.wosqualityN/A
dc.institutionauthorAkçay, Emre Caner
dc.language.isoenen_US
dc.relation.ispartofJournal of Construction Engineering, Management & Innovation (Online)en_US
dc.relation.publicationcategoryMakale - Ulusal Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.titlePrioritization of risk events in PPP wind power projects using integrated FMEA and Monte Carlo simulationen_US
dc.typeArticleen_US
dspace.entity.typePublication
relation.isAuthorOfPublicationfd0cc919-74e3-41f9-868d-b5afbdc9d807
relation.isAuthorOfPublication.latestForDiscoveryfd0cc919-74e3-41f9-868d-b5afbdc9d807
relation.isOrgUnitOfPublication01fb4c5b-b45f-40c0-9a74-f0b3b6265a0d
relation.isOrgUnitOfPublication.latestForDiscovery01fb4c5b-b45f-40c0-9a74-f0b3b6265a0d

Files

Collections