Quality Cost Assessment in Mine Tunnelling With Drilling and Blasting
No Thumbnail Available
Date
2007
Journal Title
Journal ISSN
Volume Title
Publisher
The International Journal of Mineral Resources Engineering
Open Access Color
OpenAIRE Downloads
OpenAIRE Views
Abstract
A decision making process for equipment selection in mine lateral development is presented. This addressess the need of mine development projects to increase actual lateral development rates for single headings using drilling and blasting techniques. The approach described in this papaer focuses on quality issues in a lateral development cycle by linking them to the "time value of money" concept. Th total poor quality cost estimation in lateral development is presented in case study #1, where typical lateral development practice at Falconbridge Ltd (now Xstrata Nickel) in the Sudbury basin was analyzed. A conceptual example, presented in case study#2, showa the practical application of the proposed approach and emphasizes the benefits of discrete event simulation in conjunction with process quality quantification in mine lateral development.
Description
Keywords
metallurgical and materials engineering
Turkish CoHE Thesis Center URL
Fields of Science
Citation
WoS Q
Scopus Q
Source
Volume
Issue
Start Page
End Page
Collections
Page Views
5
checked on Dec 28, 2025
Google Scholar™
Sustainable Development Goals
2
ZERO HUNGER

3
GOOD HEALTH AND WELL-BEING

5
GENDER EQUALITY

6
CLEAN WATER AND SANITATION

11
SUSTAINABLE CITIES AND COMMUNITIES

14
LIFE BELOW WATER

15
LIFE ON LAND

16
PEACE, JUSTICE AND STRONG INSTITUTIONS

17
PARTNERSHIPS FOR THE GOALS
